Week of March 04 - March 08, 2013

This week was Spring Break at NCSU, and I was out of town and unavailable for most of the week. Shortly before leaving town, however, I was contacted by the GC's superintendent with a question from the owner and the sprinkler contractor's underground subcontractor. They were wondering if there was any reason to run the pipe from the main at the street to the front of the building as we had shown instead of bringing it directly into the riser room on the side of the building, thus eliminating the need for a box-out for the pipe in a front office of the facility. I reminded the owner that we chose to run the pipe where it was shown to avoid associated complications in the event that he ever chose to add on to the facility, as the side where the pipe would be underground would be the only direction in which to add to the building. We discussed this for a few minutes, and ended up deciding to run it to the side after all. Adding onto the side of the building will still be possible, the pipe would just need to be protected when digging and pouring the footings. With this possibility being a ways off and not being a great concern anyway, I thought that avoiding a box-out in the office by bringing the pipe along the side of the building and into the closet where the riser is was a perfectly acceptable solution.

Upon returning from my trip, there were no new messages for me in regards to this project. I called the GC and the owner and both parties reported that everything was going smoothly.

No comments: