Week of March 11 - March 15, 2013

I conducted a site visit of the project on Tuesday of this week. With the sprinkler contractor out of the building, things seem to be moving along quickly for the general contractor's crew in the day care facility renovation. Moving through the building, I saw no issues with the construction to this point. Only two minor questions arose during the meeting. First, the general contractor was wondering if it was necessary to box the riser for the sprinkler system as it rose through an unfinished portion of the apartment on the second level of the building. I informed him that the riser needed to carry one-hour protection, even and especially through the unfinished space, and therefore it did need to be boxed, with two layers of sheetrock. The second question was brought up by the owner. In order to make the existing restrooms in this facility handicapped accessible (all are the same layout), we pulled the toilets each forward two feet to clear the sink beside them and allow for access from the side. In boxing behind the toilets after moving them forward, the owner pointed out, we had created dead space that was inaccessible. With the plumbing located in the ground, his suggestion was to cut off the box-out at 4'0" in height, accomplishing the same handicapped accessible layout while creating a large shelf area to be used for the storage of toilet paper and paper towels. I discussed this idea with the general contractor and saw no reason why not to do it, so we elected to take the suggestion and cut the box-out at 4' in height.

Construction is on track to finish before scheduled, and owner and contractor seem to be coexisting happily in the facility. No further issues were brought up with this project this week.

No comments: